Plasma cutting steel staircase Tung oil applied on trim woodwwork Floors milled from site grown trees Septic field restoration Reflecting afternoon sun Birth of a barn on Bragg Hill Radiant floors Solar panel installation Capping off the chimney Proud shape emerges on the hilltop Pumping concrete into the three gables Forming 12x12 Gables Delivering concrete from the sky Parallam beam positioning Flying flitch beam ICF window framing Precision concrete placement Lower level ICF fabrication Newly excavated driveway Finishing garage deck concrete Pouring concrete footers Rebar safety caps Surveying the construction site Checking out the excavation equipment Rapid soil stabilization Testing the soils for drainage Taking Solar Pathfinder measurements Milling downed trees onsite View to the Southeast over the Benzel Family Trust Future meadow to be cultivated Taking a stroll on Bragg Hill Road

Week of January 22nd, 2012

Green Technologies at Work

Not quite the star ship Enterprise, but close.  This mechanical room hosts most of the active and passive green technologies that power 60 Bragg Hill.

Read More »

Posted 01.25.12 in Category: Panorama Photos,Green Technologies

Follow the Development of 60 Bragg Hill via RSS

Photos:


More information

Information and background on this project: