Plasma cutting steel staircase Tung oil applied on trim woodwwork Floors milled from site grown trees Septic field restoration Reflecting afternoon sun Birth of a barn on Bragg Hill Radiant floors Solar panel installation Capping off the chimney Proud shape emerges on the hilltop Pumping concrete into the three gables Forming 12x12 Gables Delivering concrete from the sky Parallam beam positioning Flying flitch beam ICF window framing Precision concrete placement Lower level ICF fabrication Newly excavated driveway Finishing garage deck concrete Pouring concrete footers Rebar safety caps Surveying the construction site Checking out the excavation equipment Rapid soil stabilization Testing the soils for drainage Taking Solar Pathfinder measurements Milling downed trees onsite View to the Southeast over the Benzel Family Trust Future meadow to be cultivated Taking a stroll on Bragg Hill Road

House Footprint is Surveyed and Staked

The team at Regester Associates completed a detailed survey and staked out the approved footprint for the new home.  The stakeout included the precise position of the perimeter of the home, the proposed driveway and the parking courtyard.  The heavily overgrown underbrush of the site was recently cleared to make way for Jim Fritsch and his staff to complete this task.  This exposed the true contour of the land in the immediate vicinity of the proposed home. 

Get Adobe Flash player

A temporary platform was erected at the level of the first floor to enable us to see our view of the property from the perspective of the house for the first time.

Get Adobe Flash player

The 360 degree view from the platform was better than we could have imagined.