Plasma cutting steel staircase Tung oil applied on trim woodwwork Floors milled from site grown trees Septic field restoration Reflecting afternoon sun Birth of a barn on Bragg Hill Radiant floors Solar panel installation Capping off the chimney Proud shape emerges on the hilltop Pumping concrete into the three gables Forming 12x12 Gables Delivering concrete from the sky Parallam beam positioning Flying flitch beam ICF window framing Precision concrete placement Lower level ICF fabrication Newly excavated driveway Finishing garage deck concrete Pouring concrete footers Rebar safety caps Surveying the construction site Checking out the excavation equipment Rapid soil stabilization Testing the soils for drainage Taking Solar Pathfinder measurements Milling downed trees onsite View to the Southeast over the Benzel Family Trust Future meadow to be cultivated Taking a stroll on Bragg Hill Road

House is re staked in preparation for the start of construction

Next to a large pile of top soil at the top of Bragg Hill, the team from Regester Associates re staked the boundaries of the future home in preparation for the excavation of the foundation.

Get Adobe Flash player

Use your mouse to pan image side to side, or up and down. Shift key to zoom in, Ctrl key to zoom out.