Plasma cutting steel staircase Tung oil applied on trim woodwwork Floors milled from site grown trees Septic field restoration Reflecting afternoon sun Birth of a barn on Bragg Hill Radiant floors Solar panel installation Capping off the chimney Proud shape emerges on the hilltop Pumping concrete into the three gables Forming 12x12 Gables Delivering concrete from the sky Parallam beam positioning Flying flitch beam ICF window framing Precision concrete placement Lower level ICF fabrication Newly excavated driveway Finishing garage deck concrete Pouring concrete footers Rebar safety caps Surveying the construction site Checking out the excavation equipment Rapid soil stabilization Testing the soils for drainage Taking Solar Pathfinder measurements Milling downed trees onsite View to the Southeast over the Benzel Family Trust Future meadow to be cultivated Taking a stroll on Bragg Hill Road

Lower Level ICF Structure

Final preparations are made to stabilize and assure the ICF walls are straight and level prior to being filled with 11 feet of concrete.  The Lite Form walls are stabilized with Reechcraft adjustable ICF bracing that keeps the walls straight and provides a scaffolding platform required for the concrete pour.

Get Adobe Flash player

Use your mouse to pan image side to side. Shift key zooms in, Ctrl key zooms out.