Plasma cutting steel staircase Tung oil applied on trim woodwwork Floors milled from site grown trees Septic field restoration Reflecting afternoon sun Birth of a barn on Bragg Hill Radiant floors Solar panel installation Capping off the chimney Proud shape emerges on the hilltop Pumping concrete into the three gables Forming 12x12 Gables Delivering concrete from the sky Parallam beam positioning Flying flitch beam ICF window framing Precision concrete placement Lower level ICF fabrication Newly excavated driveway Finishing garage deck concrete Pouring concrete footers Rebar safety caps Surveying the construction site Checking out the excavation equipment Rapid soil stabilization Testing the soils for drainage Taking Solar Pathfinder measurements Milling downed trees onsite View to the Southeast over the Benzel Family Trust Future meadow to be cultivated Taking a stroll on Bragg Hill Road

Week of September 25th, 2011

The End of Wall Clutter as we Know it

The End of Wall Clutter as we Know it

Wall Rash can be a huge problem, especially with all of the lighting, audio visual, HVAC and other technologies that need switching.  Here’s how we used Lutron technologies to eliminate this eye-sore and give us our walls back.

Read More »

Posted 09.25.11 in Category: Green Technologies

Follow the Development of 60 Bragg Hill via RSS

Photos:


More information

Information and background on this project: